ARCHIVED - Telecom Order CRTC 2012-681

This page has been archived on the Web

Information identified as archived on the Web is for reference, research or recordkeeping purposes. Archived Decisions, Notices and Orders (DNOs) remain in effect except to the extent they are amended or reversed by the Commission, a court, or the government. The text of archived information has not been altered or updated after the date of archiving. Changes to DNOs are published as “dashes” to the original DNO number. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats by contacting us.

PDF version

Ottawa, 13 December 2012

Rogers Communications Partnership – Withdrawal of multi-frequency (MF) routing option

File number: Tariff Notice 27

1. The Commission received an application from Rogers Communications Partnership (RCP), dated 15 October 2012, in which the company proposed changes to its Access Services Tariff items 302.1 – Feature Group D Interconnecting Circuits and 501.3 – Call Routing – Location Routing Number (LRN) Absent.1

2. Specifically, RCP proposed to withdraw references to multi-frequency (MF) signalling2 because its switching equipment will no longer be able to support this signalling technique and no telecommunications service provider has ever requested it from RCP.

3. RCP also proposed to remove references to charges for Call Routing – Location Routing Number (LRN) Absent that are applicable to MF and line-side access3 interconnecting circuits, indicating that line-side interconnection is an outdated technology and that there is no demand for it from RCP’s existing customers.

4. The Commission approved RCP’s application on an interim basis in Telecom Order 2012-591.

5. The Commission received no comments regarding RCP’s application. The public record of this proceeding, which closed on 27 November 2012, is available on the Commission’s website at www.crtc.gc.ca under “Public Proceedings” or by using the file number provided above.

6. The Commission notes that since no customers currently subscribe to these services, customer notification was not required. The Commission considers that RCP’s proposal complies with the requirements set out in Telecom Decision 2008-22, in which the Commission revised its procedures for dealing with applications to destandardize and/or withdraw tariffed services.

7. In light of the above, the Commission considers RCP’s proposal to be reasonable. Accordingly, the Commission approves on a final basis RCP’s application.

Secretary General

Related documents



Footnotes:

[1]   This service provides processing for calls from a telecommunications service provider (TSP) when the TSP does not transmit the LRN of the serving switch to which the call must be routed for termination.

[2]   MF signalling is an in-band signalling technique that uses a series of tones to transmit information to establish a phone call, allowing signals to be sent over the same links as the phone call itself.

[3]   Line-side interconnections are generally used to connect a customer’s equipment to the serving end-office switch in the telephone network, but can also be used by competitors to connect their network to the telephone company’s network.

Date modified: