Co-Location: Power Charges

 

Task(s):

  • CLTF0001.DOC - 35KB - Power Charges Sub-working Group - Charges for Power at Co-location Sites - 20 November 2000

Contribution(s):

  • CLCO078a.doc - 43KB - In relation to TIF CLTF0001 - Contribution from Norm Peacey, AXXENT Corp. - Proposed Cost/Rate Relationship and Proposed New Rate Structure - 19 February 2001
  • CLCO096A.DOC - 23KB - CLCO096A.PPT - 67KB - Related to TIF number CLTF0001 - Contribution from Dave Belchamber, Bell Canada - Preliminary Power Study Results - 4 June 2001
  • CLCO096B.ZIP - 37Zip - Related to TIF number CLTF0001 - Contribution from Dave Belchamber, Bell Canada - Preliminary Power Study Results - 18 June 2001
  • CLCO096C.ZIP - 39KB - Related to TIF number CLTF0001 - Contribution from Dave Belchamber, Bell Canada - Draft Power Study Results - 24 July 2001
  • CLCO100A.DOC - 39KB - Related to TIF number CLTF0001 - Contribution from Randy Schuyler, Coalition for Better Co-location - Preliminary Power Study Results - 20 June 2001
  • CLCO100B.DOC - 48KB - Related to TIF number CLTF0001 - Contribution from Randy Schuyler, Coalition for Better Co-location - Preliminary Power Study Results - 12 July 2001
  • CLCO109A.DOC - 40KB - DRAFT - Related to TIF number CLTF0001 - Contribution from Jacques Poddar, Call-Net - Settlement of DC power charges pursuant to tariff structure changes - 18 September 2001
  • CLCO111A.ZIP - 53KB - Related to TIF number CLTF0001 - Contribution from Dave Belchamber, Bell Canada - ILEC make-whole proposal - 18 October 2001

Report(s):

  • CLRE022A.DOC - 45KB - Consensus Report - Related to TIF number CLTF0001 - Definition of co-location power cost components - 20 August 2001 - (Approved by Decision CRTC 2001-637, 5 October 2001)

Decision(s):

Dispute(s): None

Date modified: