Telecom Decision CRTC 2026-87

PDF version

Gatineau, 13 May 2026

Public record: 8621-C12-01/08

CISC Emergency Services Working Group – Report ESRE0098b – Next-Generation 9-1-1 Reliability, Resiliency, and Security Best Practices and Standards

Summary

9-1-1 is a bridge that connects Canadians to emergency services in times of need. Federal, provincial, territorial, and municipal governments, as well as telecommunications service providers (TSPs) all play a role in ensuring that Canadians can access 9-1-1 services. The Commission’s role is to regulate the TSPs that connect 9-1-1 calls to local 9-1-1 call centres.

Next-Generation 9-1-1 (NG9-1-1) is a new and improved 9-1-1 service. Once fully implemented, NG9-1-1 will give Canadians and 9-1-1 call centres tools that will provide quicker and more accessible communication during emergencies. The Commission acknowledges the importance of NG9-1-1 and will continue to support the transition within its mandate.

Because the transition to NG9-1-1 involves TSPs, the Commission has a role in setting certain technical standards. The CRTC Interconnection Steering Committee (CISC) Emergency Services Working Group (ESWG) supports the development of these technical standards. The ESWG is composed of expert groups that play distinct roles in providing 9-1-1 services to Canadians. These groups include first responders, public safety answering points, TSPs, and provincial, territorial, and municipal governments. Once the ESWG has developed recommendations on a technical standard, it submits a report to the Commission. These recommendations support the Commission in decisions on 9-1-1 services within its role of regulating TSPs.

Following Commission requests on the development of an NG9-1-1 service outage notification process, CISC approved and filed with the Commission a follow-up report from the ESWG regarding NG9-1-1 reliability, resiliency, and security best practices and standards. The report provides six recommendations aimed at minimizing the likelihood of NG9-1-1 service outages and ensuring that, should outages occur, their impact on Canadians is mitigated to the maximum extent feasible.

In this decision, the Commission approves five of the ESWG’s recommendations on a final basis, and one recommendation, with modifications, on an interim basis.

Background

  1. In Telecom Regulatory Policy 2016-165, the Commission asked the CRTC Interconnection Steering Committee (CISC) Emergency Services Working Group (ESWG) to develop a process for 9-1-1 network providers to notify originating network providers (ONPs) and public safety answering points (PSAPs) of outages on legacy 9-1-1 networks.
  2. In Telecom Decision 2017-389, the Commission approved, with modifications, an initial 9-1-1 service outage notification process, and mandated its implementation by 9-1-1 network providers (the legacy 9-1-1 outage process). The Commission also asked the ESWG to review and update, as required, the legacy 9-1-1 outage process to address any new issues and incorporate any new notification tools that may emerge with the implementation of Next-Generation 9-1-1 (NG9-1-1).
  3. In Telecom Regulatory Policy 2019-66, the Commission requested the ESWG to assess and make recommendations on a number of technical and operational considerations pertaining to two databases that underpin NG9-1-1 services. These are the Location Information Server (LIS), which ensures that NG9-1-1 calls are delivered to the PSAPs serving the callers’ locations, and the Additional Data Repository (ADR), which provides PSAPs receiving the calls with ancillary data about the callers (e.g., phone numbers, locations, etc.).
  4. On 4 September 2025, the Commission set out, in Telecom Decision 2025-225, a new regulatory framework for the notification and reporting of major telecommunications service outages. The new framework mandated both 9-1-1 network providers and ONPs to notify PSAPs of any major 9-1-1 service outage, as defined in that decision.Footnote 1 The Commission also requested the ESWG to present, by 4 March 2026, an updated outage notification process that both ONPs and 9-1-1 network providers should implement to notify PSAPs of major legacy 9-1-1 and NG9-1-1 service outages.
  5. The Commission notes that the ESWG report that is the subject of the present decision was filed prior to the publication of Telecom Decision 2025-225. Therefore, when developing the report’s recommendations, particularly recommendation 6 pertaining to NG9-1-1 service outage notification, the ESWG did not have an opportunity to take into account the Commission’s determinations and request found in that decision.

The report

  1. To address the Commission’s requests set out in Telecom Decision 2017-389 and Telecom Regulatory Policy 2019-66, the ESWG filed with the Commission its consensus reportFootnote 2 ESRE0098b, NG9-1-1 Reliability, Resiliency, and Security Best Practices & Standards.
  2. In the report, the ESWG made consensus recommendations along four themes:


    (a) establishing reliability and resiliency standards pertaining to the LIS and ADR databases (recommendations 1, 2, and 3);

    (b) promoting a hybrid approach for processing NG9-1-1 calls without location information (recommendation 4);

    (c) fostering PSAP cybersecurity readiness (recommendation 5); and

    (d) formalizing an NG9-1-1 service outage notification process (recommendation 6).

Theme A – Establishing reliability and resiliency standards pertaining to the LIS and ADR databases (recommendations 1, 2, and 3)

  1. The first recommendation under this theme sets out a data quality assurance standard for the LIS database, which is critical for accurately delivering NG9-1-1 calls to the appropriate PSAPs.
  2. The second recommendation sets out reliability standards for both the LIS and ADR databases. Given the critical role of the LIS database in the delivery of NG9-1-1 calls, the ESWG recommended that the database must maintain or exceed a reliability standard of 99.999%. In contrast, the ESWG ascribed a secondary importance to the ADR database, because the data it contains are provided to PSAPs after the calls have been delivered to them to facilitate the dispatch of first responders. As such, the ESWG considered that a lower reliability standard for the ADR database would be appropriate, namely, that it must be redundant, have no single point of failure, be cybersecure, and provide encrypted data.
  3. The third recommendation sets out a data auditing standard for both the LIS and ADR databases.
  4. The recommended standards for the LIS and ADR databases reflect the current state of 9-1-1 network providers’ hosted services.Footnote 3 The ESWG’s three recommendations related to this theme primarily affect ONPs that have opted or may plan to self-provision their LIS and ADR databases to ensure consistent reliability and resiliency regardless of the chosen implementation method.

Theme B – Promoting a hybrid approach for processing NG9-1-1 calls without caller location information (recommendation 4)

  1. The ESWG assessed alternative processes for delivering NG9-1-1 calls in the unlikely event of a failure in the LIS database. In that scenario, the location information of affected NG9-1-1 calls would be unavailable or unusable for call-routing purposes. As a result, those calls would not be automatically delivered to the appropriate PSAPs.Footnote 4
  2. Saskatchewan has long implemented a best practice where one default PSAP is responsible for all 9-1-1 calls originating in the province, except for two major population centres, which are each served by a dedicated PSAP. These three PSAPs are interconnected for mutual aid purposes (e.g., call-load sharing during mass calling events). Building on that best practice, Saskatchewan indicated that, when transitioning to NG9-1-1, it would implement a hybrid approach for processing NG9-1-1 calls without caller location information. Specifically, calls that ONPs can reasonably guarantee to have originated within the province would go to the default PSAP for triage, while others would go to third-party call centres. New Brunswick and Nova Scotia have also indicated their interest in adopting a similar best practice.
  3. The ESWG therefore recommended that all provinces and territories transitioning to NG9-1-1 be encouraged to consider designating one or more default PSAPs within their respective jurisdictions.

Theme C – Fostering PSAPs’ cybersecurity readiness (recommendation 5)

  1. The ESWG has continued its self-initiated effort to identify cybersecurity best practices and resources for the benefit of PSAPs. Additional PSAP cybersecurity resources identified in the report include the Canadian Centre for Cyber Security’s Baseline Cyber Security Controls for Small and Medium Organizations V1.2 framework. The ESWG recommended that PSAPs be strongly encouraged to immediately review and apply the cybersecurity controls and business processes as detailed in section 2.4 and Appendix C of the report.

Theme D – NG9-1-1 service outage notification (recommendation 6)

  1. In accordance with Telecom Decision 2017-389, the ESWG proposed an NG9-1-1 service outage notification process (the proposed NG9-1-1 outage process) that is built on the legacy 9-1-1 outage process.Footnote 5 It recommended that ONPs and 9-1-1 network providers be directed, and PSAPs be encouraged, to implement the proposed NG9-1-1 outage process.
  2. The ESWG emphasized that ONPs should be mandated to notify 9-1-1 network providers of originating network outages disrupting 9-1-1 call delivery,Footnote 6 pending the conclusion of the Telecom Notice of Consultation 2023-39 proceeding.Footnote 7

Commission’s analysis

  1. The Commission considers that the ESWG’s recommendations 1 through 5, as set out in the report, are appropriate and can be approved without modification. These recommendations are aligned with the Commission’s objectives to minimize the possibility of NG9-1-1 calls not being delivered to the appropriate PSAPs, and to provide high-quality information, services, and support to PSAPs, which ultimately enables emergency responders to effectively assist Canadians.
  2. The Commission is of the view that the ESWG’s recommendation 6, however, requires some modifications, given that the proposed NG9-1-1 outage process is not suitable for approval on a final basis, as discussed below.

NG9-1-1 service outage notification (recommendation 6)

  1. The Commission notes that the proposed NG9-1-1 outage process will need to be updated, because it was developed prior to the publication of Telecom Decision 2025-225. Specifically, it will need to incorporate the new definition of a major 9-1-1 service outage and related requirements set out in that decision.
  2. Given that the development and approval of an updated process will take some time, the Commission considers it appropriate to establish interim NG9-1-1 outage notification obligations based on subsection 4.1 of the proposed NG9-1-1 outage process. That subsection sets out requirements pertaining to 9-1-1 network providers, which are generally aligned with the Commission’s determinations in Telecom Decision 2025-225. However, the Commission finds that a specific provision that requires outage status updates every hour (the time cap provision) constitutes an unnecessary burden on 9-1-1 network providers and should be removed. Instead, in accordance with the requirements set out in Telecom Decision 2025-225, updates should be provided as soon as possible following a material change to the information provided in the notification.
  3. The Commission is of the view that subsection 4.2 of the proposed NG9-1-1 notification process, which addresses originating network outage notification, should not be adopted at this time in light of the Commission’s determinations and outstanding request to the ESWG in Telecom Decision 2025-225.
  4. The Commission notes that subsections 4.1 and 4.2 reflect the use of email as a method of mass outage notification from 9-1-1 network providers and ONPs, a method first approved by the Commission in Telecom Decision 2017-389 as part of the legacy 9-1-1 outage process. However, given the widespread adoption of new communication platforms since that time, the Commission questions whether email remains the most efficient and effective tool for time-sensitive mass outage notification. The Commission is therefore of the view that the ESWG should reassess this approach to address a number of considerations as set out in the Commission’s determinations in the conclusion to this decision.
  5. Subsection 4.3 of the proposed NG9-1-1 outage process sets out best practices for PSAPs. The Commission notes that these practices are not affected by the determinations set out in Telecom Decision 2025-225 and considers it appropriate to approve subsection 4.3 of the proposed NG9-1-1 outage process on a final basis.

Matters for further consideration

  1. The report identifies nine matters for further consideration pertaining to the LIS and ADR databases, the third-party call centres that triage NG9-1-1 calls without caller location information, and other NG9-1-1 matters that require ongoing monitoring. Section 6 of the report includes a full list and description of the matters for further consideration. Matter for further consideration #2 is particularly relevant to this decision. It concerns the development of a notification process for breaches or attempted breaches of the LIS and ADR databases. While this work was initially requested in Telecom Regulatory Policy 2019-66 and the ESWG committed to filing a recommended process by the end of 2025, the Commission is of the view that the scope of this matter for consideration should be expanded.
  2. The Commission notes that data about 9-1-1 calls and/or callers containing sensitive and personally identifiable information may be processed or stored in systems beyond the LIS and ADR databases, including systems that hold 9-1-1 call recordings. Given the importance of timely notification of breaches or attempted breaches to mitigate potential harm and prevent further unauthorized access, the Commission considers it reasonable to request that the ESWG expand the scope of matter for further consideration #2 to encompass all NG9-1-1 systems, including those operated by PSAPs, that process or store sensitive data about 9-1-1 calls and/or callers. In light of the expanded scope of work, the Commission sets an updated deadline of 13 August 2026 for this request. Further details regarding this request are set out in the Commission’s determinations in the conclusion to this decision.

Conclusion

  1. In light of all of the above, the Commission approves the ESWG’s recommendations 1 through 5, as set out in the report, without modification, and approves on an interim basis recommendation 6, with some modifications.
  2. Accordingly, the Commission:
    • directs ONPs and 9-1-1 network providers, as a condition of offering and providing telecommunications services, to implement the requirements stemming from recommendations 1 through 3, as applicable to them, as set out in Appendix 1 to this decision; and
    • encourages provincial and territorial governments and PSAPs to consider implementing the best practices stemming from recommendations 4 and 5, as applicable to them, as set out in Appendix 1 to this decision.
  3. Regarding recommendation 6, the Commission:
    • approves on an interim basis, effective 13 May 2026, the implementation of subsection 4.1 of the proposed NG9-1-1 outage process as set out in Appendix 2 to this decision, which has been modified to remove the time cap provision, until the Commission approves an updated NG9-1-1 outage process for 9-1-1 network providers that is aligned with its determinations in Telecom Decision 2025-225 (the interim period);
    • directs, as a condition of offering and providing telecommunications services, 9-1-1 network providers to implement subsection 4.1 of the proposed NG9-1-1 outage process, as set out in Appendix 2 to this decision, during the interim period; and
    • approves on a final basis subsection 4.3 of the proposed NG9-1-1 outage process as set out in Appendix 2 to this decision and encourages PSAPs to implement the best practices it sets out.

Related issues

  1. Regarding the issue of mass outage notification by email, the Commission requests the ESWG, as part of its work to update the legacy 9-1-1 and the proposed NG9-1-1 outage processes in accordance with the Commission’s request set out in Telecom Decision 2025-225, to:
    • describe any issues, including delayed or missed notifications, that may have been encountered by stakeholders, especially PSAPs, as a direct result of the current method;
    • assess the practicability of implementing add-on improvements to the current method, or implementing alternative mechanisms or tools, with a view to increasing the efficiency and efficacy of notifications, including mass notifications;
    • provide a recommendation, along with detailed justifications, as to whether the current method remains the most efficient and effective option available, and, if not:
      • describe how the current method could be improved or replaced; and
      • provide a feasible date by which the recommended improvement or replacement could be implemented.
  2. Regarding the time cap provision, the Commission requests the ESWG to ensure the removal of the time cap provision from the updated E9-1-1 and NG9-1-1 service outage notification processes pertaining to both 9-1-1 network providers and ONPs.
  3. Regarding the issue of data breach or breach attempt notification, the Commission requests the ESWG to expand the scope of matter for further consideration #2 to:
    • document all NG9-1-1 systems, whether under the control of ONPs, 9-1-1 network providers, or PSAPs, that process and/or store sensitive data pertaining to 9-1-1 calls and/or callers; and
    • present to the Commission a notification process pertaining to breaches or breach attempts of such systems by 13 August 2026.

Secretary General

Appendix 1 to Telecom Decision CRTC 2026-87

Requirements and best practices stemming from the recommendations in the Emergency Services Working Group’s report ESRE0098b (the report)

Requirements for Next-Generation 9-1-1 (NG9-1-1) network providers and originating network providers

Recommendation 1
  1. The Commission directs all originating network providers (ONPs) that opt to self-provision their Location Information Server (LIS) databases, from inception and on an ongoing basis, to only store locations that have been validated using the location validation function.Footnote 8
Recommendation 2
  1. The Commission directs 9-1-1 network providers, and all ONPs that opt to self-provision their LIS and/or Additional Data Repository (ADR) databases, from inception and on an ongoing basis, to:
    • ensure that their respective hosted and self-provisioned LIS databases meet or exceed the 99.999% reliability standard; and
    • ensure that their respective hosted and self-provisioned ADR databases:
      • are redundant;
      • have no single point of failure;
      • are secured against cyber threats based on current best practices demonstrably compliant with an industry standard, such as the United States National Institute of Standards and Technology’s Cybersecurity Framework 2.0;Footnote 9 and
      • provide encrypted data.
Recommendation 3
  1. The Commission directs all ONPs that opt to self-provision their LIS and/or ADR databases to, from inception and on an ongoing basis, build an access auditing mechanism into their LIS and/or ADR databases by:
    • adopting a mechanism equivalent to the one currently implemented in Enhanced 9-1-1;Footnote 10 or
    • logging additions, deletions, and modifications or updates for auditing purposes.
Recommendation 6
  1. The Commission directs 9-1-1 network providers to implement subsection 4.1 of the provisionally approved NG9-1-1 outage process, with one modification, as set out in Appendix 2 to this decision, during the interim period.

Best practices for provinces, territories, and public safety answering points

Recommendation 4
  1. The Commission encourages all provinces and territories implementing NG9-1-1 to consider designating one or more default public safety answering points (PSAPs) for their respective jurisdictions.
Recommendation 5
  1. The Commission strongly encourages PSAPs to immediately review and apply the cybersecurity best practices set out in section 2.4 and Appendix C of the report.
Recommendation 6
  1. The Commission encourages PSAPs to implement subsection 4.3 of the proposed NG9-1-1 outage process, as set out in Appendix 2 to this decision.

Appendix 2 to Telecom Decision CRTC 2026-87

Provisionally Approved Next-Generation 9-1-1 Outage Notification Process (extracts from ESRE0098b, Appendix B)

4.1 NG9-1-1 Network Provider Notification ResponsibilitiesFootnote 11

4.3 PSAP Notification Responsibilities